Prime Contractor: Archer Western JV
T2 Contracting partnered with Walsh to install a 30″ HDPE around a planned Construction Site. We tapped the existing line, installed valves to make it happen. We will then insert to 24″ Double Line-Stops so that part of the line can be removed. Big Pipe!
Prime Contractor: Shellco
T2 Contracting, Inc. late night repair of a 12″ DIP Water Main busted, valve blew off in Valve MH! 14 Hours non stop!
Prime Contractor: Walbridge
T2 Contracting performing an install on a IWT at a Corrosion Facility! We can handle the deep burry tanks.
Prime Contractor: Bristol
T2 Contracting Partnered with Bristol to develop a 9 Acre wooded site into this facility that is in progress 2022. We performed all sitework, utility and concrete pavement.