KC46A Construct Two Bay Corrosion/Fuel Cell Hanger
Prime Contractor: Walbridge-Aldinger
T2 Contracting partnered with Walbridge on a $56.5 Million Demolition and Reconstruction project located at Seymour Johnson Air Force Base in Goldsboro, North Carolina. The existing single-bay hanger will be replaced with a new 181,000 square foot two-bay hanger. This expansion will house corrosion control, wash rack, fuel system maintenance, aircraft maintenance shop and other administrative functions for the KC46 Refueling Planes Stationed at Seymour Johnson Air Force Base.
Posted in Uncategorized
