Repair Tanker Ramp Ramp Pavement
Prime Contractor: RC Construction
T2 Contracting partnered with RC Construction in replacing a 48,000 square foot area of variable 8”-15” concrete pavement with new 15” concrete pavement. This project included storm drain, utility demo and installation, grading, new Underdrain and cleanout installation with new catch basins and manholes.
Posted in Uncategorized
